Our company, in a joint venture with VISCO Technical, completed the restoration of three 80-meter-high chimneys at the Linoperamata Thermal Power Station of PPC.
The work included:
- Removal of deteriorated concrete from the external surfaces of the chimneys
- Repair of the refractory lining inside the chimneys
- High-pressure hydroblasting at 500 bar
- Application of thixotropic repair mortar Geolite by Kerakoll
- Spraying of concrete (gunite) up to 40 meters high
- Painting with high-durability coatings by International Yacht Paint Europe
The project was completed to high standards of quality and safety, ensuring full functionality and long-term durability of the structural elements.