Our company carried out the rock stabilization project at the iconic Idaion Andron Cave in Psiloritis, with NIRIKOS TECHNICAL S.A. as the main contractor.
The objective of the project was the installation of 10-meter-long stainless steel full-length anchors. The work was executed using 2,000 m² of PERI rosette-type scaffolding.